This section is The content in this section is supplied by GlobeNewswire for the purposes of distributing press releases on behalf of its clients. Postmedia has not reviewed the content. by GlobeNewswire Article content
TORONTO, Sept. 08, 2026 (GLOBE NEWSWIRE) — DPM Metals Inc. (TSX: DPM, ASX: DPM)
(ARBN: 689370894) (“DPM” or “the Company”) today reported intercepts from drilling at the Dumitru Potok and Rakita North copper-gold-silver prospects, located on the Čoka Rakita exploration licence.
Sign In or Create an Account
or View more offersArticle content
Highlights include:
Article contentWe apologize, but this video has failed to load.Try refreshing your browser, or
tap here to see other videos from our team.Article content
- Extension of Dumitru Potok mineralization: Drilling extends the marble-hosted intrusive skarn mineralization approximately 90 metres west and 100 metres southwest (drillholes BIDD253 and DPDD037A) and returned encouraging results 300 metres to the north of the Mineral Resource (DPDD039A), indicating further expansion potential at shallow levels.
- Targets remain open: Results demonstrate further growth potential at Dumitru Potok and Rakita North, with mineralization open along strike, laterally and at depth, including priority extensions to the west and southwest of the existing Dumitru Potok Mineral Resource, and to the north and east at Rakita North. These results improve the Company’s understanding of mineralization geometry and indicate mineralized tonnage may be greater than previously modelled.
- Increased drilling program: DPM is expanding the 2026 drilling program by an additional 12,000 to 15,000 metres, increasing planned drilling for the year to approximately 32,000 to 35,000 metres. The drilling program will focus on expanding the existing Dumitru Potok Mineral Resource estimate, infill drilling and target testing across the Čoka Rakita exploration licence.
- PEA to be completed by year end 2027: An updated Dumitru Potok Mineral Resource estimate is expected to be complete by the end of the first quarter of 2027, which will form the basis of a Preliminary Economic Assessment (“PEA”) targeted to be complete by the end of 2027.
Article content
Story continues below
This advertisement has not loaded yet, but your article continues below.
Article content
- Selected intercepts include:
- BIDD253: 246 metres grading 1.36% CuEq, comprising 0.67% Cu, 0.69 g/t Au and 4.21 g/t Ag from 1,377 metres downhole, including 26 metres grading 2.07% CuEq, comprising 0.76% Cu, 1.33 g/t Au and 4.48 g/t Ag.
- BIDD254: 30 metres grading 1.56% CuEq, comprising 0.85% Cu, 0.68 g/t Au and 5.92 g/t Ag from 761 metres downhole, and 29 metres grading 1.29% CuEq, comprising 0.70% Cu, 0.57 g/t Au, and 4.96 g/t Ag from 843 metres downhole.
- DPDD041: 84 metres grading 2.06% CuEq, comprising 0.71% Cu, 1.37 g/t Au and 4.88 g/t Ag from 1,085 metres downhole, and 51 metres grading 2.17% CuEq, comprising 0.87% Cu, 1.30 g/t Au and 6.20 g/t Ag from 1,320 metres downhole.
- DPDD042: 50 metres grading 3.68% CuEq, comprising 2.18% Cu, 1.36 g/t Au and 21.75 g/t Ag from 761 metres downhole, including 21 metres grading 5.44% CuEq, comprising 3.80% Cu, 1.33 g/t Au and 37.63 g/t Ag from 772 metres downhole.
- RADDGTH009C: 76 metres grading 2.66% CuEq, comprising 1.76% Cu, 0.88 g/t Au and 7.30 g/t Ag from 623 metres downhole, including 33 metres grading 3.51% CuEq, comprising 2.40% Cu, 1.07 g/t Au and 9.68 g/t Ag from 655 metres downhole.
Article content
Story continues below
This advertisement has not loaded yet, but your article continues below.
Article content
See Table 1 and associated footnotes for full results from drilling and for details on the copper equivalent calculation.
Article content
“With mineralization open in all directions, we are increasing our 2026 drilling program for the Rakita Camp up to 35,000 metres as we pursue what we believe is a district-scale discovery,” said David Rae, President and Chief Executive Officer of DPM Metals.
Article content
“These results extend mineralization 100 metres beyond the existing Mineral Resource and continue to demonstrate Dumitru Potok’s significant growth potential.
Article content
“DPM’s strong local presence in the region for over 20 years, strong relationships within local communities, demonstrated commitment to rigorous safety and environmental standards and track record as a responsible operator in the Balkans are the foundation of our approach to value creation.
Article content
“We are proceeding with a preliminary economic assessment, expected to be complete by year-end 2027, demonstrating our excitement and confidence in the Rakita Camp’s potential as a Tier One asset in our portfolio.”
Article content
Dumitru Potok prospect

