This section is The content in this section is supplied by GlobeNewswire for the purposes of distributing press releases on behalf of its clients. Postmedia has not reviewed the content. by GlobeNewswire Article content
TORONTO, Sept. 09, 2026 (GLOBE NEWSWIRE) — Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX:TSK | OTCQB:TSKFF) is pleased to report continued success from underground development on the 1030 Level at the Mustang Mine, where the Company has successfully developed on a continuous 79-metre strike length of high-grade gold mineralization along the BK Vein. The zone comprises a well-defined banded quartz vein averaging 64.84 grams per tonne (g/t) gold across an average true width of 0.50 metres. These encouraging results extend the high-grade ore shoot from the 1045 Level, reported on April 15, 2026, and provide further validation of Talisker’s geological model, with continued demonstration of increasing grade and improved continuity of mineralized structures with depth within the Mustang Mine at the Bralorne Gold Project, British Columbia, Canada.
Sign In or Create an Account
or View more offersArticle content
Story continues below
This advertisement has not loaded yet, but your article continues below.
Article content
Key Highlights:
Article contentWe apologize, but this video has failed to load.Try refreshing your browser, or
tap here to see other videos from our team.Article contentArticle content
- 496 g/t over 0.51 m within 156.97 g/t over 1.64 m from 1030 BK Vein, East Face No. 16
- 203 g/t over 0.54 m within 100.81 g/t over 1.09 m from 1030 BK Vein, East Face No. 18
- 167 g/t over 0.48 m within 61.27 g/t over 1.31 m from 1030 BK Vein, East Face No. 17
- 147 g/t over 0.35 m within 51.16 g/t over 1.21 m from 1030 BK Vein, East Face No. 22
- 114 g/t over 0.43 m within 43.58 g/t over 1.14 m from 1030 BK Vein, East Face No. 19
- 112 g/t over 0.47 m within 24.36 g/t over 2.39 m from 1030 BK Vein, East Face No. 28
- 74.7 g/t over 0.47 m within 37.53 g/t over 1.98 m from 1030 BK Vein, East Face No. 23
- 37.2 g/t over 0.80 m within 20.98 g/t over 1.50 m from 1030 BK Vein, East Face No. 28
Article content
Terry Harbort, CEO of Talisker commented, “These outstanding results from a well-defined ore shoot along the BK Vein demonstrate the remarkable structural and grade continuity of the auriferous quartz-vein systems across the Mustang Mine. With the BK structure delineated by diamond drilling over more than 750 metres of strike and remaining open beyond 500 metres depth, we see significant potential to extend known ore shoots and delineate additional high-grade shoots as mining advances. We look forward to reporting further results from our continued mining development and drilling at the Bralorne Gold Project.”
Article content
Story continues below
This advertisement has not loaded yet, but your article continues below.
Article contentBralorne Gold Project
Mustang Mine – 1030 Lateral Development
Assay ResultsFace NameFrom
(m)To
(m)Interval
(m)Au
(g/t)Sample #M1030_BK_OD_E1_F300.80.837.2X003456M1030_BK_OD_E1_F30.81.50.72.44X003457M1030_BK_OD_E1_F31.52.370.870.62X003458M1030_BK_OD_E1_F32.373.210.840.01X003459M1030_BK_OD_E1_F1600.990.990.09X003758M1030_BK_OD_E1_F160.991.40.4110.5X003759M1030_BK_OD_E1_F161.41.910.51496X003761M1030_BK_OD_E1_F161.912.630.720.23X003762M1030_BK_OD_E1_F162.633.430.80.08X003763M1030_BK_OD_E1_F1701.081.080.03X003785M1030_BK_OD_E1_F171.081.560.48167X003786M1030_BK_OD_E1_F171.562.390.830.12X003787M1030_BK_OD_E1_F172.393.190.80.05X003788M1030_BK_OD_E1_F1800.810.810.97X003814M1030_BK_OD_E1_F180.811.360.550.47X003815M1030_BK_OD_E1_F181.361.90.54203X003816M1030_BK_OD_E1_F181.93.331.435.56X003817M1030_BK_OD_E1_F1900.50.50.01X003829M1030_BK_OD_E1_F190.51.420.920.005X003831M1030_BK_OD_E1_F191.421.780.360.37X003832M1030_BK_OD_E1_F191.782.210.43114X003833M1030_BK_OD_E1_F192.212.560.351.5X003834M1030_BK_OD_E1_F192.563.520.960.09X003835M1030_BK_OD_E1_F2200.860.860.04X003903M1030_BK_OD_E1_F220.861.290.4320.1X003904M1030_BK_OD_E1_F221.291.640.35147X003905M1030_BK_OD_E1_F221.642.070.434.22X003906M1030_BK_OD_E1_F222.073.461.390.09X003907M1030_BK_OD_E1_F2300.920.9241.2X003915M1030_BK_OD_E1_F230.921.390.4774.7X003916M1030_BK_OD_E1_F231.391.980.592.2X003917M1030_BK_OD_E1_F231.982.930.950.26X003918M1030_BK_OD_E1_F232.933.860.930.37X003919M1030_BK_OD_E1_F2800.850.850.97X004118M1030_BK_OD_E1_F280.851.320.47112X004119M1030_BK_OD_E1_F281.321.930.612.35X004121M1030_BK_OD_E1_F281.933.241.313.17X004122*Estimated true widths are between 90% and 100% of interval lengths.

